TRUSS VS. STICK FRAMING FACTS

Switching from costly stick framing to efficient component framing can generate substantial savings.

233.4 TOTAL JOBSITE HOURS SAVED Calculate Your Savings
Industry Update

Framing the American Dream:

New project proves component framing is more efficient in terms of man hours, materials and waste.

The 2015 Framing the American Dream project built a stick framed home, side by side, with a component framed home, to compare the relative efficiency of the two approaches.

See The Results
Bottom line: With trusses, the complexity of our roofing operation is about 10% of what it was when we were stick framing… while saving us labor costs, lowering our risk, lowering our waste and making us a better and more efficient homebuilder.

George Aiken, Partner, Savvy Homes

READ OUR CUSTOMER STORY
build build2 buildability-process collaborate control-material-cost control-material-cost2 download-sapphire economic-forecast eliminate-variance finalize framing-american-dream labor-shortage logo-mitek long-arrow margin-protection material-cost-and-pricing mitek mitek-contact-us nav-arrow plan prefab-structural-components reduce-cycle-time reduce-cycle-time reduce-design-time reduce-jobsite-waste reduce-labor-cost skilled-labor-shortage solution-header success-stories truss-guy white-paper